Development Underwriting
Project
Cloud account & project sync
Connect your Supabase project once on each device. Only use the Project URL and publishable (anon) key — never a secret or service-role key. Your existing local projects remain available.
Not connected. Local saving still works.
If you already created a Supabase Authentication user in the dashboard, use its email and password here. A dashboard-created user may need a password set or reset first. Email confirmation may be required for new accounts.
Cloud saves are separate from the existing “Save project” button, which continues saving to this device. Cloud saves with the same name update your existing cloud project.
1. Acquisition & hard construction
1A. General contractor compensation
Choose Included when the builder's per-square-foot quote already covers GC compensation. Choose Flat fee or Percentage only when the construction $/sq ft input excludes GC compensation. Unused fee fields are ignored. Soft-cost percentage applies to base construction plus GC fee.
2. Sitework, soft costs & contingency
Soft costs = construction × percentage + manual amount. Include plans, engineering, survey, permits and other professional fees here. Keep sitework and soft costs at $0 only when confirmed included in the construction bid.
3. Construction financing
Estimated loan = LTC × eligible acquisition, construction, sitework, soft costs and contingency. Interest = loan × average utilization × annual rate × months / 12. This is a planning approximation, not a draw schedule or lender quote. Set LTC to 0 for an unfinanced deal.
4. Holding costs & selling costs
Selling costs automatically recalculate with ARV. Default 6% covers commissions and seller closing expenses; use additional selling expenses for concessions or other costs not covered by that percentage.
5. Investment criteria & capital
If cash invested is 0, the calculator estimates required equity as total project costs less the modeled loan. Actual peak cash requirements depend on lender draw timing, reserves, and financing structure.
6. Projected results
REVIEWMargin versus target:
7. Reverse underwriting — maximum allowable costs
Reverse calculations recalculate financing and selling expenses as land, construction, or ARV changes. Negative allowable amounts indicate that the target cannot be achieved under current assumptions.
8. Actual results — enter after project sale
Enter 0 for categories with no actual costs. Enter actual construction costs INCLUDING any separately paid GC fee. Actual profit displays once sale price and all 9 cost categories are entered. Actual cash-on-cash requires actual cash invested.
Underwriting estimates only. Financing assumes a simplified average balance, not actual lender draw timing. Profit is sale proceeds less all modeled costs before income taxes. Cash-on-cash is not annualized. Local projects use this browser's storage; cloud projects require Supabase sign-in. Export JSON backups for portability. Do not count a cost twice across categories.